have you seen any one working on that site no everything is 100% there. thet wanted to lay at 10m cable and that should have been done with in one day where as the small part of signal turning to left was closed for several days.
[img_assist|nid=21285|title=.|desc=|link=none|align=left|width=|height=0]
have you seen any one working on that site no everything is 100% there. thet wanted to lay at 10m cable and that should have been done with in one day where as the small part of signal turning to left was closed for several days.
[img_assist|nid=21285|title=.|desc=|link=none|align=left|width=|height=0]