basantak

basantak

Member since: September 2017
Send a Message
Timeline
About

 

BASANTA KUMAR KHADKA

Sanaiya left 39, Qatar

Mobile: +974-30522671, E-mail: [email protected]

curriculam vitae

 

 

1. Name of the Firm                 : Bandan Bhagwati Nirman Sewa Pvt. Ltd., New Baneshwor                     

2. Name                                   : KHADKA, Basanta Kumar

3. Date of Birth                         : 20th April, 1982                  

4. Education                             :

  • Bachelor Degree in Civil Engineering (2014) from Nepal Engineering College (Pokhara University) with 3.21 CGPA
  • Diploma in Architecture Engineering (2002) from Thapathali Engineering College (Tribhuvan University, Nepal) with 1st class, 75% with scholarship.
  • School Leaving Certificate (1999) from Gyanodaya Bal Batika Higher Secondary Boarding School (H.M.G Board of Nepal) with 78% with scholarship.

5. Membership of Professional Associations:

  • Member, Nepal Engineering Council ( 12682 “A” Civil )

6. Computer Knowledge

  • AutoCAD 2D & 3D-Expert
  • SAP 2000; Staad.PRO- Expert
  • Smart Road (Road Designing Software)- Expert
  • Dequa (Suspension Bridge Designing Software)- Expert
  • MS-Office (Word, Excel, Power point)-Expert
  • Operating System; Windows, DOS-Expert
  • Graphics Designing and Publication-Intermediate
  • MS-Project, 3D Max- Intermediate
  • Hardware- Intermediate
  • Primavera-Intermediate

 

7. Countries of Work Experience:        Nepal, India (3 yrs.), Kingdom of Saudi Arabia(3 yrs.)


8. Languages                           :                                   Speaking                     Reading                        Writing

                                                            English             Good                            Excellent                        Excellent

                                                            Nepali               Excellent                       Excellent                       Excellent

9. Employment Record            :

From April 2017                 : To Date

Employer                           :  Bandan Bhagwati Nirman Sewa Pvt. Ltd.

Position Held                     :  Project Manager, Construction of RCC Counter fort wall

 

From August 2016              :  To April 2017

Employer                           :  Bandan Bhagwati Nirman Sewa Pvt. Ltd.

Position Held                     :  Construction Manager, Construction of Road.

 

From April 2016                 :  To August 2016

Employer                           :  Bandan Bhagwati Nirman Sewa Pvt. Ltd.

Position Held                     :  Project Manager, Construction of Tailrace Tunnel at Upper Bhotekoshi Hydropower Ltd.

 

From April 2011                 :  April 2016

Employer                           :  RAB International Consultancy Pvt. Ltd.

Position Held                     :  Civil Engineer For various Projects.

 

From Oct. 2009                   :  To April 2011

Employer                           :  Nepal Consult Pvt. Ltd.

Position Held                     :  Sr. Civil Engineer, for UN ART rehabilitation work of 23 sites at 21 districts of Nepal.

 

From Sept. 2005                 :  To Oct. 2009

Employer                           :  M/s Saudi Archirodon Company, Saudi Arabia.

Position Held                     :  Technical Office Engineer/ Site Engineer, for Flue Gas Desulphurization Project at Kingdom of Saudi Arabia.

 

From May 2003                  :  To August 2005

Employer                           :  Taisei Corporation, Japan

Position Held                     :  Designer, for Purulia Pumped Storage Project, 900 MW (Lot-4 Main Civil Works)

 

10. Detailed Tasks Assigned    :

  1. Technical advisory service
  2. Technical and financial monitoring
  3. Lead the team
  4. Implementation Support and Quality Assurance of the road.
  5. Procuring related works, goods and services, certification of related works carried out in compliance with the specification, making payments to sub-contractors, suppliers and labors, and overall contract management.
  6. Develop monitoring procedures;
  7. Design of the road;
  8. Construction supervision of the works; and
  9. Preparation and submission of reports.


11. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned

Name of assignment or Project  :  RCC Counter fort wall (Net worth Nrs. 60,000,000 to be completed in 2 months)

Year                                            :  April 2017 till date)

Location                                     :  Angeri Pakha, Sindhupalchowk

Client                                          :  Department of Water Induced Disaster Management (Ministry of Irrigation)

Main Project features                 :  Construction of 135 m long, 10m high RCC counterfort wall for the preparation of landslide.

Position Held                              :  Project Manager

Activities performed                   :  Lead the team and provide every member of his team with job description; Organize/ Lead/ Supervise pre-construction survey, design review. Insure timely logistic and other support; Plan schedule, monitor and control the team's work to insure timely completion; Coordinate and consult with client Project Manager and other stakeholders; Prepare Reports, Conduct Meetings and disseminate information and Organize. Quality Assurance and preparation of bills.

 

Name of assignment or Project  :  Khagdal Dovan-Thantichaur-Karthali-Dolangsa Road Construction (11 K.m.) (Net worth Nrs. 400,000,00)

Year                                            :  August 2016 to April 2017

Location                                     :  Sindhupalchowk district of Nepal

Client                                          :  Department of Road (DOR)

Main Project features                 :  Widening and upgrading of existing road.

Position Held                              :  Construction Manager

Activities performed                   :  Detail survey, alignment fixation, detail design, construction supervision of road following Labor Based Environmental Friendly and Participatory (LEP) approach, assist DOR. Site supervision, Preparation of Bills, Quality Assurance.

 

Name of assignment or Project  :  Construction of Tailrace Tunnel

Year                                            :  April 2016 to August 2016

Location                                     :  Jhirpu, Sindhupalchowk

Client                                          :  Upper Bhotekoshi Hydropower Limited.

Main Project features                 :  Tailrace Canal Repair Works

Position Held                              :  Project Manager

Activities performed                   :  Joint Survey, Preparation of bar bending schedule, work schedule and IPC (Interim Payment Certificates.) Co-ordination between labors, clients, Conducting inspection, quality assurance, layout of different structures etc.

 

Name of assignment or Project  :  Various projects.

Year                                            :  April 2011 to April 2016

Location                                     :  Nepal

Client                                          :  RAB International Consultancy Pvt. Ltd.

Main Project features                 :  Designing/ Supervision

Position Held                              :  Civil Engineer

Activities performed                   :  Detailed survey of Civil homes for city bikas basti site; includes topographical survey, detailed survey, design of road, quantity calculation, Layout or road, plot of buildings and other amenities like manhole drainage system, light pole etc.; topographical. Detailed survey of road, land, hydropower, irrigation projects etc., and preparation of detailed topographical/ landscaping. Contoured drawings, Detailed traverse survey of land, road, bridges (RCC/ Suspension). Design of Road, buildings, bridges, Quantity Surveying, Preparation of bills, VAT registration, Account handling etc.

 

 


Name of assignment or Project  :  UN ART rehabilitation work

Year                                            :  October 2009 to April 2011

Location                                     :  21 Districts of Nepal

Client                                          :  UN House Nepal

Main Project features                 :  UN ART Rehabilitation works

Position Held                              :  Sr. Civil Engineer/ Team Leader

Activities performed                   :  Detail Analysis of existing building, preparation of as-built drawings, design of ART center with furniture layout as per UN standard, Detail quantity estimation, preparation of rate analysis ana BOQ, specification, bid document, Site supervision, checking of final bills.

 

 

Name of assignment or Project  :  Flue Gas Desulphurization Project

Year                                            :  September 2005 to October 2009

Location                                     :  Jeddah, Kingdom of Saudi Arabia

Client                                          :  M/S Saudi Archirodon Company

Main Project features                 :  Construction of Flue Gas Desulphurization Project

Position Held                              :  Technical Office Engineer/ Site Engineer

Activities performed                   :  Interaction with client and consultant, handling inspection and getting approval, supervision of surveyors work, preparing drawings for submission, preparing working and detailed drawings, preparation of reinforcement detailed drawing and bar bending schedule, quantity calculation, drawings management; updating filing system      

 

 

Name of assignment or Project  :  Purulia Pumped Storage Project

Year                                            :  May 2003 to August 2005

Location                                     :  Baghmundi, West Bengal India

Client                                          :  Taisei Corporation

Main Project features                 :  Lot-4 Main Civil works, Construction of 900 MW hydropower

Position Held                              :  Designer

Activities performed                   :  Preparing modification and modified drawings, preparing temporary facilities drawings, Preparing mechanical, Electrical, Architectural facilities drawings, site supervision, preparing survey drawings, Getting approval of detail drawings, preparing drawings for excavation, support pattern, concrete, Quantity Calculation for the submission of running/ final bill, Making progress drawing and maintaining progress sheet, Preparation of daily reports, Handling inspection and getting approval, Execution of photography and videography of tunnel faces for record and preparation of geological report, preparing daily/ weekly work schedule. Converting 2D drawings to 3 D for easy visualization to different site member.

12. Certification

I, the undersigned, certify that, to the best of my knowledge and belief, this CV correctly describes myself, my qualification, and my experience. I understand that any willful misstatement described herein may lead to my disqualification or dismissal, if engaged.

https://www.facebook.com/basa082
Timeline

Basantak hasn't posted anything yet.