Congestion of traffic, some 8 years ago was huge in the down town areas, however after shifting of shops from Musharieb, traffic flow became smooth in that area, but with the launch of new Mushrieb project, the traffic in the down town again could be bottlenecked soon.

The long term solution also includes conversion of roundabout into signals and signals into under passes and overhead bridges that can handle large volume of traffic.