FQ are questionable at best. According to the contract they need to give us 30 days written notice of handover and this has not come.

I doubt UDC will allow them to hand over the apartments as the roads to and from those units appear to be still full of construction materials and blocked off. If you look at the Pearl, there are loads of places that are finished up to where the canal is in the middle and they are not yet occupied nor are you able to drive a car to them and then after the canal FQ's building is the only one that looks remotely finished among all the continued construction. I doubt UDC will let them had over in that state or even if UDC are ready to hand over.

The problem is with FQ they fabricate the truth so often it is really hard to believe anything they say anymore. Nothing is their fault and the truth is always a murcky shade of black. I've lost faith in them totally.