The asphalt works in that street was not executed properly, and they need to re-do them now before the entire street asphalt collapses and then it would be such a bigger problem to solve.
this road is destined to troubles since that it has very wet lower layer
The road contractor CGC started digging the road since 4-10-2011. As per their engineer, this is a 4-5 months project.http://www.qatarliving.com/node/2154897#comment-1978698This is one of the busiest road connecting many schools at Mamoura & the above closure has worsten the traffic.Pity you parents whom dropping their children before reaching their offices.
Qatar's winter months are brimming with unmissable experiences, from the AFC Asian Cup 2023 to the World Aquatics Championships Doha 2024 and a variety of outdoor adventures and cultural delights.
Fasten your seatbelts and get ready for a sweet escape into the world of budget-friendly Mango Sticky Rice that's sure to satisfy both your cravings and your budget!
Celebrate World Vegan Day with our list of vegan food outlets offering an array of delectable options, spanning from colorful salads to savory shawarma and indulgent desserts.
The asphalt works in that street was not executed properly, and they need to re-do them now before the entire street asphalt collapses and then it would be such a bigger problem to solve.
this road is destined to troubles since that it has very wet lower layer
refurbishment and upgrade BUT very inappropiate time chosen...should have waited till the summmer break 2012.
The road contractor CGC started digging the road since 4-10-2011. As per their engineer, this is a 4-5 months project.http://www.qatarliving.com/node/2154897#comment-1978698This is one of the busiest road connecting many schools at Mamoura & the above closure has worsten the traffic.Pity you parents whom dropping their children before reaching their offices.
its 2 years now... time to change
They have to upgrade the road to make it have a smooth surface.
I'm sorry but I don't know why.