Timeline
About

CURRICULUM VITAE 

MASOUD IBRAHIM MASOUD ZAKZOUK

Address:  Al Rayyan, Doha, Qatar.                

 

Personal Information :

Name

:

MASOUD IBRAHIM MASOUD ZAKZOUK

Profession

:

Surveyor

Position

:

Senior Surveyor - Survey Manager

Nationality

:

Egyptian

Date of Birth

:

20/03/1981

Marital Status

:

Married

Languages Spoken

:

Arabic, English.

Education

:

Bachelor of Surveying and Mapping 2002

General Grade

:

Good   65%

Working Experience

:

Qatar - United Arab Emirates - Egypt

Mobile           

:

+974 3080 8744    &    +974 3054 6539

Email

:

[email protected]  &  [email protected]

 

My Main Goal:

Join an upscale and sophisticated company, which helps me develop my abilities, scientific and practical skills, and participate in its prosperity and development.

 

Summary Experience:

Senior Surveyor 16 years of experience in works of (Construction, Airports, Roads/Highways, Infrastructure, Bridges, Tunnels, Railways, Oil and gas Infrastructure, Pipelines, Landscape, Topographical survey works), Experience in using all modern surveying equipment and software, Auto CAD program, Civil 3D, Liscad, Microsoft programs, Establishment of the survey networks and control points, preparation of topographic maps and drawings, Review of the submitted shop drawings, calculation of quantities, management of survey department and work as Surveyor, Survey Specialist, Senior Surveyor, Survey Manager.

 

Education and Seminars:

 

University

:

Tanta

 

Faculty

:

Arts Geography

Department

:

Geography

 

Division

:

Surveying and Mapping

Graduation Date

:

2002

 

Grade

:

Good   65%

 

 

Companies Summary throughout 15 years of experience:

 

§  Ital Consult - Qatar Branch - Doha, Qatar.

§  United Consultants Engineering - Doha, Qatar.

§  Sacyr Construction S.A - Doha, Qatar.

§  Shuttering Construction - Cairo, Egypt.

§  Wepco Trans - Abu Dhabi, United Arab Emirates.

§  M. A. Kharafi & Sons - Abu Dhabi, United Arab Emirates.

§  Al Marasem International for Urban Development - Cairo, Egypt.

 

 

§  B.G Consulting Group Consulting Group - Cairo, Egypt.

§  Egyptian Company for Touristic Development - Cairo, Egypt.

§  Surveying Perfect - Alexandria, Egypt.

 

 

Experience of Professional Companies:

 

 

 

-

Date

:

8/2017 To Present 

 

 

 

 

-

Company

:

Ital Consult - Qatar Branch, Doha - Qatar.

 

 

 

 

-

Position

:

Senior Surveyor

 

 

 

 

-

Project Title

:

P007-C3 Interim Construction and Upgrade of Al Rayyan Road Phase-3 (Sports Roundabout).

 

 

 

 

-

Project Details

:

Construction of Roads, Infrastructure, Irrigation, Landscape.

 

 

 

 

-

Project Client

:

Public Works Authority (Ashghal) - Qatar.

 

 

 

 

-

Role Description

:

 

 

 

-

Supervise the survey teams and perform the most complex works on the field survey team.

 

 

-

Perform all survey works in the project accurately and efficiently, such as topographic survey, setting out, calculate quantities, work reports, as-built after construction stages.

 

 

-

Preparation of topographical maps and other survey drawings.

 

 

-

Establish of Traverse networks, survey control points and corrected it.

 

 

-

Provide support and advice to a design, supervision and engineers, contractors before the design process, starting of project and throughout the stages of work.

 

 

-

Reviewing the submitted shop drawings in relation to the coordinates, levels, before start of project and throughout the stages of work.

 

 

-

Coordinate all works and comparing them to each other.

 

 

-

Provide support and advice to survey manager, survey teams and work to raise its efficiency and develop skills continuously.

 

 

 

 

-

Location

:

Qatar - Doha, Al Rayyan

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Date

:

6/2015 To 8/2017 

 

 

 

 

-

Company

:

United Consultants, Doha - Qatar.

 

 

 

 

-

Position

:

Survey Manager

 

 

 

 

-

Project Title

:

More than 7 Projects (Supervise on all Projects the Office in Qatar).

 

 

 

 

-

Project Details

:

Construction of Factories - Schools - kindergartens - Malls - markets - Residential Building - Residential Complexes - Residential Villas.

 

 

 

 

-

Project Client

:

Public Works Authority (Ashghal), and many other clients in Qatar.

 

 

 

 

-

Role Description

:

 

 

 

-

Management of the survey department, supervise the survey teams and perform the most complex works on the field survey team.

 

 

-

Perform all survey works in the project accurately and efficiently, such as topographic survey, setting out, calculate quantities, work reports, as-built after construction stages.

 

 

-

Preparation of topographical maps and other survey drawings.

 

 

-

Provide support and advice to a design, supervision and engineers, contractors before the design process and during of work stages.

 

 

-

Reviewing the submitted shop drawings in relation to the coordinates, levels, in addition to comment / approval before start of project and throughout the stages of work.

 

 

-

Coordinate all works and comparing them to each other.

 

 

-

Provide support and advice to the survey team and work to raise its

Efficiency and develop skills continuously.

 

 

-

Respond to the inquiries and complaints of all members of survey team and solve them.

 

 

 

 

-

Location

:

Qatar - Doha, Al Rayyan.

 

 

 

 

-

Date

:

8/2014 To 5/2015

 

 

 

 

-

Company

:

Sacyr Construction S.A, Doha – Qatar.

 

 

 

 

-

Position

:

Senior Surveyor

 

 

 

 

-

Project Title

:

Roads and Infrastructure in Bani Hajer North - Rawdat Egdaim

 

 

 

 

-

Project Details

:

Construction of Roads, Infrastructure, Irrigation, Landscape, Water Tanks.

 

 

 

 

-

Project Client

:

Public Works Authority (Ashghal) - Qatar.

 

 

 

 

-

Role Description

:

 

 

 

-

Supervise the survey teams and perform the most complex works on the field survey team.

 

 

-

Perform all survey works in the project accurately and efficiently, such as topographic survey, setting out, calculate quantities, work reports, as-built after construction stages.

 

 

-

Preparation of topographical maps and other survey drawings.

 

 

-

Establish of Traverse networks, survey control points and corrected it.

 

 

-

Role Description

:

 

 

 

-

Supervise the survey teams and perform the most complex works on the field survey team.

 

 

-

Perform all survey works in the project accurately and efficiently, such as topographic survey, setting out, calculate quantities, work reports, as-built after construction stages.

 

 

-

Preparation of topographical maps and other survey drawings.

 

 

-

Establish of Traverse networks, survey control points and corrected it.

 

 

-

Provide support and advice to a design, supervision and engineers, contractors before the design process, starting of project and throughout the stages of work.

 

 

-

Reviewing the submitted shop drawings in relation to the coordinates, levels, before start of project and throughout the stages of work.

 

 

-

Coordinate all works and comparing them to each other.

 

 

-

Provide support and advice to survey manager, survey teams and work to raise its efficiency and develop skills continuously.

 

 

-

Respond to the inquiries and complaints of all members of survey team and solve them.

 

 

 

 

-

Location

:

Bani Hajer, Doha, Qatar.

 

 

 

 

 

 

 

 

-

Date

:

1/2014 To 8/2014

 

 

 

 

-

Company

:

Shuttering Construction, Cairo - Egypt.

 

 

 

 

-

Position

:

Senior Surveyor

 

 

 

 

-

Project Title

:

Aswar Project- New Cairo Residential Complex.

 

 

 

 

-

Project Details

:

Construction of Residential Complex from 75 residential villas, Internal Roads, Infrastructure, Irrigation, Landscape.

 

 

 

 

-

Project Client

:

Aswar United Company - Cairo, Egypt.

 

 

 

 

-

Role Description

:

 

 

 

-

Supervise the survey teams and perform the most complex works on the field survey team.

 

 

-

Perform all survey works in the project accurately and efficiently, such as topographic survey, setting out, calculate quantities, work reports, as-built after construction stages.

 

 

-

Preparation of topographical maps and other survey drawings.

 

 

-

Establish of Traverse networks, survey control points and corrected it.

 

 

-

Provide support and advice to a design, supervision and engineers, contractors before the design process, starting of project and throughout the stages of work.

 

 

-

Reviewing the submitted shop drawings in relation to the coordinates, levels, before start of project and throughout the stages of work.

 

 

-

Coordinate all works and comparing them to each other.

 

 

 

-

Provide support and advice to survey manager, survey teams and work to raise its efficiency and develop skills continuously.

 

 

-

Respond to the inquiries and complaints of all members of survey team and solve them.

-

Location

:

New Cairo, Cairo, Egypt.

 

 

 

 

 

 

 

 

-

Date

:

From 6/2012 To 10/2013

 

 

 

 

-

Company

:

Wepco Trans, Abu Dhabi - Arab Emirates.

 

 

 

 

-

Position

:

Survey Manager

 

 

 

 

-

Project Title

:

Shah Sulphur Station & Pipeline Project.

 

 

 

 

-

Project Details

:

Construction of the Roads, Infrastructure, Railway, Pipeline, Landscape.

 

 

 

 

-

Project Client

:

Abu Dhabi National Oil Company (ADNOC) Developer - UAE.

 

 

 

 

-

Role Description

:

 

 

 

 

 

 

 

-

Supervise the survey teams and perform the most complex works on the field survey team.

 

 

-

Perform all survey works in the project accurately and efficiently, such as topographic survey, setting out, calculate quantities, work reports, as-built after construction stages.

 

 

-

Preparation of topographical maps and other survey drawings.

 

 

-

Establish of Traverse networks, survey control points and corrected it.

 

 

-

Provide support and advice to a design, supervision and engineers, contractors before the design process, starting of project and throughout the stages of work.

 

 

-

Reviewing the submitted shop drawings in relation to the coordinates, levels, before start of project and throughout the stages of work.

 

 

-

Coordinate all works and comparing them to each other.

 

 

-

Provide support and advice to survey manager, survey teams and work to raise its efficiency and develop skills continuously.

 

 

-

Respond to the inquiries and complaints of all members of survey team and solve them.

-

Location

:

Liwa, Abu Dhabi United Arab Emirates.

 

 

 

 

 

 

 

-

Date

:

From 12/2008 To 2/2012

-

Company

:

M. A. Kharafi & Sons, Abu Dhabi - Arab Emirates.

 

 

 

 

-

Position

:

Senior Surveyor

 

 

 

 

-

Project Title

:

Development of Al-Salam Street - Eastern Corniche Road

 

 

 

 

-

Project Client

:

Abu Dhabi National Oil Company (ADNOC)

Developer - UAE.

-

Role Description

-

Supervise the survey teams and perform the most complex works on the field survey team.

 

 

-

Perform all survey works in the project accurately and efficiently, such as topographic survey, setting out, calculate quantities, work reports, as-built after construction stages.

 

 

-

Preparation of topographical maps and other survey drawings.

 

 

-

Establish of Traverse networks, survey control points and corrected it.

 

 

-

Reviewing the submitted shop drawings in relation to the coordinates, levels, before start of project and throughout the stages of work.

 

 

-

Coordinate all works and comparing them to each other.

 

 

-

Provide support and advice to survey manager, survey teams and work to raise its efficiency and develop skills continuously.

 

 

-

Respond to the inquiries and complaints of all members of survey team and solve them.

 

 

-

Supervise the survey teams and perform the most complex works on the field survey team.

-

Location

:

Abu Dhabi - Arab Emirates.

 

 

 

 

 

 

 

 

-

Date

:

From 8/2007 To 9/2008

-

Company

:

Al Marasem International for Urban Development, Cairo - Egypt.

-

Position

:

Senior Surveyor

-

Project Title

:

Construction of the Second-Phase of Medical Union Pharmaceuticals Company in Abu Sultan, Ismailia.

-

Project Details

:

Construction of Warehouses, Administrative Offices, Roads and Landscape.

-

Project Client

:

Medical Union Pharmaceuticals Company, Cairo - Egypt.

 

 

 

 

-

Role Description

:

 

 

 

-

Perform all survey works in the project accurately and efficiently, such as topographic survey, setting out, calculate quantities, work reports, as-built after construction stages

 

 

-

Preparation of topographical maps and other survey drawings.

 

 

-

Establish of Traverse networks, survey control points and corrected it.

 

 

-

Provide support and advice to a design, supervision and engineers, contractors before the design process, starting of project and throughout the stages of work.

 

 

-

Reviewing the submitted shop drawings in relation to the coordinates, levels, before start of project and throughout the stages of work.

 

 

 

-

Reviewing the submitted shop drawings in relation to the coordinates, levels, before start of project and throughout the stages of work.

 

-

Location

:

Abu Sultan, Ismailia, Egypt.

 

 

 

 

 

 

 

 

 

 

 

-

Company

:

Al Marasem International for Urban Development, Cairo - Egypt.

 

 

 

 

 

 

-

Position

:

Senior Surveyor

 

 

 

 

 

 

-

Project Title

:

Al Moqattam Heights

 

 

 

 

 

 

-

Project Details

:

Construction of Residential Villas Complex, Roads, Infrastructure, Irrigation, Landscape.

 

 

 

 

 

 

-

Project Client

:

Emaar Misr Company, Cairo - Egypt.

 

 

 

 

 

 

-

Role Description

:

 

 

 

 

-

Perform all survey works in the project accurately and efficiently, such as topographic survey, setting out, calculate quantities, work reports, as-built after construction stages

 

 

 

-

Preparation of topographical maps and other survey drawings.

 

 

 

-

Establish of Traverse networks, survey control points and corrected it.

 

 

 

-

Coordinate all works and comparing them to each other.

 

 

 

-

Provide support and advice to survey manager, survey teams and work to raise its efficiency and develop skills continuously.

 

 

 

-

Respond to the inquiries and complaints of all members of survey team and solve them.

 

-

Location

:

Al Moqattam, Cairo, Egypt.

 

 

 

 

 

 

 

 

 

 

 

-

Date

:

From 5/2005 To 6/2006

 

 

 

 

 

 

-

Company

:

BG Consulting Group, Cairo - Egypt.

 

-

Position

:

Survey Specialist

 

-

Project Title

:

Cairo International Airport Project, (Terminal 2)

 

-

Project Details

:

Construction of the Passenger Terminal, Tunnels, Internal Roads.

 

-

Project Client

:

Egyptian Ministry of Civil Aviation, Cairo - Egypt.

 

-

Role Description

:

 

 

 

 

-

Perform all survey works in the project accurately and efficiently, such as topographic survey, setting out, calculate quantities, work reports, as-built after construction stages

 

 

 

-

Preparation of topographical maps and other survey drawings.

 

 

 

-

Coordinate all works and comparing them to each other.

 

 

 

-

Establish of Traverse networks, survey control points and corrected it.

 

 

 

-

Provide support and advice to survey manager, survey teams and work to raise its efficiency and develop skills continuously.

 

 

 

-

Respond to the inquiries and complaints of all members of survey team and solve them.

 

-

Location

:

Heliopolis, Cairo, Egypt.

 

 

-

Date

:

From 1/2004 To 12/2004

 

 

 

 

-

Company

:

Egyptian Company for Touristic Development, Cairo - Egypt.

 

 

 

 

-

Position

:

Survey Specialist

 

 

 

 

-

Project Title

:

Al Solaimaneyah Golf Resort

 

 

 

 

-

Project Details

:

Construction of Tourist Resort Consists of: A Complex of Villas, Palaces, Hotel, Restaurants, Schools, Gymnasiums, Gardens, Roads, Infrastructure and Landscape.

 

 

 

 

-

Project Client

:

Egyptian Company for Touristic Development, Cairo - Egypt.

-

Role Description

:

 

 

 

-

Perform all survey works in the project accurately and efficiently, such as topographic survey, setting out, calculate quantities, work reports, as-built after construction stages

 

 

-

Preparation of topographical maps and other survey drawings.

 

 

-

Coordinate all works and comparing them to each other.

 

 

-

Establish of Traverse networks, survey control points and corrected it.

 

 

-

Provide support and advice to survey manage, survey teams and work to raise its efficiency and develop skills continuously.

 

 

-

Respond to the inquiries and complaints of all members of survey team and solve them.

-

Location

:

Km 55, Cairo Alex. desert rd., Giza, Egypt.

 

 

 

 

 

 

 

 

-

Date

:

From 6/2003 To 12/2003

 

 

 

 

-

Company

:

Surveying perfect, Alexandria - Egypt.

 

 

 

 

-

Position

:

Survey Specialist

 

 

 

 

-

Project Title

:

A multi of different and diverse projects, Alexandria - Egypt.

 

 

 

 

-

Project Details

:

Construction of Residential Villas Complex, Residential Buildings, Factories.

-

Project Client

:

Multiple Owners, Alexandria - Egypt.

-

Role Description

:

 

 

 

-

Perform all survey works in the project accurately and efficiently, such as topographic survey, setting out, calculate quantities, work reports, as-built after construction stages

 

 

-

Preparation of topographical maps and other survey drawings.

 

 

-

Establish of Traverse networks, survey control points and corrected it.

 

 

-

Provide support and advice to a design, supervision and engineers, contractors before the design process, starting of project and throughout the stages of work.

 

 

-

Coordinate all works and comparing them to each other.

-

Location

:

Alexandria, Egypt.

 

-

Date

:

From 10/2002 To 6/2003

 

 

 

 

-

Company

:

Works of special surveying projects, Alexandria - Egypt.

 

 

 

 

-

Position

:

Survey Specialist

 

 

 

 

-

Project Title

:

Many of sites and various projects

-

Project Details

:

Topography Surveys, Construction Works, Steel Structure, Levels.

 

 

 

 

-

Project Client

:

Multiple Owners, Alexandria - Egypt.

 

 

 

 

-

Role Description

:

 

 

 

-

Perform all survey works in the project accurately and efficiently, such as topographic survey, setting out, calculate quantities, work reports, as-built after construction stages

 

 

-

Preparation of topographical maps and other survey drawings.

 

 

-

Establish of Traverse networks, survey control points and corrected it.

 

 

-

Provide support and advice to a design, supervision and engineers, contractors before the design process, starting of project and throughout the stages of work.

 

 

-

Coordinate all works and comparing them to each other.

-

Location

:

Alexandria, Egypt.

 

Experience Gained:

Ø  Experience in using all modern and advanced survey equipment such as (Total Station, GPS, 3D Scanner Stations, and Automatic Level.

Ø  Experience in using surveying Programs, AutoCAD, Civil 3D and Microsoft Office Programs.

Ø  Perform all survey works accurately and efficiently, and solve complex problems.

Ø  Establish of Traverse networks, Survey Control Points and Corrected it.

Ø  Preparation of topographical maps and other survey drawings.

Ø  Coordinate all works and comparing them to each other.

Ø  Provide support and advice to survey team and work to raise competence and develop skills.

Ø  Reviewing the submitted shop drawings in relation to the coordinates and levels, in addition to comment and approval them.

Ø  Provide support and advice to a design and supervision engineers before the design process and throughout of work stages in the projects.

Ø  Work as a coordinator between different departments through coordination of the drawings and linking them together, and help solve the problems.

Ø  Excellent experience in management of surveying department and supervise the survey Teams in the company.

 

 

 

Skills and Abilities:

 

Ø  Comprehensive knowledge of the principles and laws of the survey and regulations in force in the State.

Ø  Knowledge of the principles and practices used in the site for the implementation of survey work and topographic survey.

Ø  Ability to understand and interpret legal descriptions, engineering plans, maps and field data.

Ø  The ability to apply basic survey principles in solving problems with sites and projects.

Ø  Knowledge of the basic principles of civil engineering related to construction, roads, bridges, tunnels and infrastructure.

Ø  Ability to train and develop the work team, and work to promote the spirit of teamwork among Team members.

Ø  Ability to maintain effective relationships with colleagues and clients.

Ø  Ability to communicate effectively orally and in writing.

 

Computer skills and Technical:

AutoCAD program, Civil 3D, Liscad, Surfer v.8, Survey Programs and data, Microsoft Office Programs (Word, Excel, PowerPoint).

 

Hobbies and Interests:

I like the design, reading engineering books in general and especially design books, historical books, playing football and table tennis, solving puzzles and socializing with family and friends.

 

Referees:

Eng. Nabil Desouki

Projects Manager

United Consultants

Tel: +97470701830

E-mail: [email protected]

 

 

Mobile : +974 3080 8744 & +974 3054 6539

E-mail: [email protected]

 

 

 

 

Timeline

[email protected] hasn't posted anything yet.