jayron0830

jayron0830

Member since: March 2017
Send a Message
Timeline
About

WORKING EXPERIENCES:

PROJECT ENGINEER / PROJECT COORDINATOR
KIAN HENG ENGINEERING WORKS PTE LTD
BEDOK NORTH STREET 5, SINGAPORE
May 2015 – November 2016

Duties and Responsibilities:

• Coordinates and attends meetings; establishes and maintains internal external contacts as necessary.
• Assist the Project Manager in the drafting and issuance of project proposals, RFP’s, tenders
budgets and preliminary schedules.
• Prepare project organization and communication charts.
• Chair site meetings and distribute minutes to all project team members.
• Track the progress and quality of work being performed by design disciplines/trades.
• Use project scheduling and control tools to monitor project plans, work hours, budgets and
expenditures.
• Effective and accurately communicate relevant project information to the client and project team.
• Ensure clients’ needs are met in a timely and cost effective manner.
• Maintain contract execution tracking log.
• Assist the Project Manager in the review of contractor quotations to ensure that only fair and
reasonable pricing is recommended for approval.
• Supervises other project staff, assigns tasks & set priorities.
• Prepare substantial completion certificates and ensure all required project close out documents are
obtained.
• Communicate ideas for improving company processes with a positive and constructive attitude, and
for developing this attitude in others.
• Keep Project Manager and others informed about project status and issues that may impact client
relations.
• Prepares records of project activities, oversees and ensures the timely processing in and the delivery
of required materials.

SITE ENGINEER – ELECTRICAL
SEPAM W.L.L
DOHA, QATAR
May 2012 – Sept. 2014

PROJECTS NAME: HAMAD INTERNATIONAL AIRPORT
SHERATON HOTEL QATAR RENOVATION

• MAIN LIGHTING, LIGHTING CONTROL, BUILDING MANAGEMENT SYSTEM, FIRE ALARM SYSTEM, PUBLIC ADDRESS SYSTEM, PUBLIC INFORMATION DISPLAY, SECURITY SYSTEM, ACCESS CONTROL SYSTEM, DATA, TDS, CCTV,TV, ELV, UPS, POWER DISTRIBUTION.

Duties and Responsibilities:

• Supervise and inspect construction in accordance to the design plans and specification. Plan and schedule the work and efficiently organize the plant and site facilities in order to meet an agreed programmed of deadlines.
• Ensure that the work is done in accordance with the approved Method of Statement and is inspected and tested in accordance with the approved Inspection and Testing Plan.
• Attend regular meetings with Technical Coordinator, MEP Manager, MEP Subcontractors and/or General Superintendent.
• Supervise and monitor the work of MEP subcontractors for compliance with contract requirements. Coordinate the work of MEP subcontractors with other works.
• Oversee quality control and safety matters and ensure that regulations are adhered to.
• Resolve any unexpected technical difficulties and other problems that may arise at the site in consultation with the Technical Coordinator, MEP Manager, and MEP subcontractor’s..
• Read and understand construction and other drawings, specifications and other technical information.
• Mark field changes on construction drawings and review As-Built drawings prepared by MEP subcontractors for compliance.
• Submit weekly and monthly progress reports to main office.
• Conduct snag list inspection with the client.
• Review and check the as built drawing to ensure done as per actual task.
• Prepare monthly reports and other documentation as requested.
• Assist in the testing and commissioning of MEP and to finishing works and to oversee the review and approval process for Electrical works (power, low current work and ELV).
• Ensure correct implementation of works according to contract design, quality of materials & workmanship.

ELECTRICAL FIELD ENGINEER
STATEGROUP INTERNATIONAL LLC.
DUBAI, U.A.E.
April 2008 – October 2011

PROJECTS NAME: DUBAI METRO PROJECT ( RED LINE & GREEN LINE )

• INSTRUSION ALARM SYSTEM, FIRE ALARM SYSTEM, PUBLIC ADDRESS SYSTEM, PUBLIC INFORMATION DISPLAY, ACCESS CONTROL SYSTEM, TDS, CCTV,TV, SWITCHES, STRUCTURED CABLING, FIBER OPTICS, POWER DISTRIBUTION.

Duties and Responsibilities:

• Conducts site surveys, plans, and manages projects, inspections and maintenance events.
• Prepares all the materials needed for the project.
• Splices, terminates, seals, tests, and troubleshoots UTP, copper and fiber –optic cable circuits (INDOOR & OUTDOOR CABLE).
• Ensures circuits and supporting systems and equipments are restored according to clients’
preferences.
• Develop detailed Design for the Voice and Data Horizontal and Vertical Intra-Building Cabling, Intermediate Distribution Frame, Telecommunications Closets and Central Equipment Rooms.
• Installation, set-up, troubleshooting of security systems.
• Conducts toolbox meetings to ensure safe execution of jobs.
• Ensures preventive maintenance schedules are developed and implemented.
• Receives the PTW from section manager and executes the job in a safe and effective manner.
• Responsible for conformance with applicable safety directives, inspection, and maintenance of assigned tools and test equipments.
• Prepares daily & weekly progress report including snag reports to be submitted to the project manager.
• Prepare the Job Order for the installation of containment, equipment and cable pulling, testing, toning, (UTP, Copper and Fiber Optic Cables).
• Prepare the drawing for cable pulling in the containment, of how many cables, type of cable, size of cable and cable labeling.
• Supervise, coordinate and review the work of various technicians engaged in maintaining, repairing and operating cable machinery and equipment, including the repair and replacement.
• Arrange to rectify the snags for inspection by the consultant.

QA / QC ENGINEER
DUTCO BALFOUR BEATTY LLC.
DUBAI, U.A.E.
April 2005 – April 2008

PROJECT NAME: THE DUBAI MALL

Duties and Responsibilities:

• Over all Supervision of Technicians, Site Supervisors and Engineers in Site Installations.
• Coordinate to the Site Engineers, Foreman and Quantity Surveyor regarding the prepared works done before making inspection requests.
• Ensure the inspection requests are implemented and all test reports are verified to meet the contract requirements.
• Develop written methods & procedures for testing equipment and running the systems.
• Ensure that work on projects meets plan & specification requirements.
• Coordinate with the QA/QC Manager for the completion of As-Built turnover documentation.
• Ensure to carry out the project specific quality management and assurance activities as detailed in the Project Quality Plan and as directed and instructed as per the technical specification.
• Arrange to rectify the snags for inspection by the consultant.
• Prepare the Handover scheduling/snagging.

TRAININGS ATTENDED:

WORK – AT – HEIGHT COURSE for SUPERVISORS
ABSOLUTE KINETICS CONSULTANCY PTE. LTD.
35 Hillview Terrace Singapore
Nov. 02 – Nov. 03, 2015

BUILDING CONSTRUCTION SUPERVISORS SAFETY COURSE
ABSOLUTE KINECTICS CONSULTANCY PTE LTD.
103 Desker Rd. Singapore
June 30 – July 3, 2015

INSTALLING PREMISES CABLING SYSTEMS
AMP CONNECT – TYCO ELECTRONICS
Dubai U.A.E.
December 2010

Timeline

Jayron0830 hasn't posted anything yet.