
Ashghal partially opens Lulu Intersection on D-Ring road

Ashghal partially opened Lulu Intersection on D-Ring Road, in coordination with the General Directorate of Traffic.
Commuters from Jaber Bin Hayyan Street and Al Hurriya Street can reach D-Ring Road towards north on left, or towards Al Matar Street on right.
افتتحت هيئة الأشغال العامة #أشغال التقاطع المعروف بتقاطع اللولو على الطريق الدائري الرابع بشكل جزئي أمام الحركة المرورية وذلك بالتنسيق مع الإدارة العامة للمرور @trafficqa pic.twitter.com/SCoBQJ3rnx
— هيئة الأشغال العامة (@AshghalQatar) March 7, 2021
Commuters from Al Matar Street via D-Ring Road can turn left to Jaber Bin Hayyan Street or turn back, and those coming from the north via D-Ring Road towards Old Airport can take a right turn at Lulu Intersection to Jaber bin Hayyan Street.
Eng. Abdulla Darwish from Highway Projects Department of Ashghal confirmed that the opening of the Lulu Intersection would smoothen traffic flow in the area, especially for commuters to and from Old Airport via D-Ring Road.
About 30% of works on the D-Ring Road development project is over and the complete delivery is expected by the first quarter of 2022.
The opening of the Lulu Intersection is the first achievement of the D-Ring Road development project, which includes the development of the Fereej Al Ali Intersection (known as Al Tadamon Interchange), Nuaija Intersection (The Mall), and Lulu Intersection.
This expansion will enhance the traffic capacity of the interchanges and largely reduce traffic congestion in the area, especially at Fereej Al Ali Interchange (Al Tadamon Interchange) loaded with heavy traffic.
The project includes the construction of a common path for pedestrians and cyclists on both sides of D-Ring Road along 4.5 kilometers, in addition to tree-plantation and landscaping works throughout the project.
--
Make sure to check out our social media to keep track of the latest content.
Instagram - @qatarliving
Twitter - @qatarliving
Facebook - Qatar Living
YouTube - qatarlivingofficial