JOB CATEGORY
Engineering
EMPLOYMENT TYPE
Full-time
JOB LEVEL
Mid Career
YEARS OF EXPERIENCE
5-6 Years
LANGUAGE
English
Jobseeker Gender
Male
Description
Vinoth Mathiazhagan
Project Coordinator
I'm Civil engineer class 2012 worked in the field of building & Infrastructure construction for six years in MNCs. Now I search for a suitable opportunity in a consultant office or Contract firms.
Experience ~ 6 Years
March’2015–Present
1. WEN Qatar W.L.L,
2.BFG International
Doha, Qatar
Project Coordinator
• Doha Metro Project (GRP Cladding Package)
• Project In-charge for Station Entrance Shelters GRP cladding works.
• Coordinating Design & Site teams
• Deal with Clients, Consultants, Designers & Architects.
• Preparing Contract claims & variations
• Engineering approvals & Project Hanover
Technical Office Civil Engineer
• Shaza Hotel (5 Star – 3B+GF+FL16)
• RC Structural Work Package
• Engineering documents preparation, submission & approvals
• Preparing technical proposal for tenders
• Verifying IFC drawings & Checking of rebar/form work shop drawings
• Solving site technical issues.
• Project budgeting, Quantity surveying works
Nov’2012– Jan’ 2015
3.Eversendai Construction, Mumbai, India
Assistant Engineer
• Mixed Use Project, (Tower B – 85 Floors)
• RC Structural Work Package
• In-Charge of Rebar Fabrication per day 90 tons.
• Coordinating site for timely supply of rebars
• Preparing Reconciliation reports, procurement schedules, stock reports and auditing reports
• Well-practiced in rebar coupling system
May’ 2012– Nov’2012
4.MC Constructions, Puducherry, India
Site Engineer
• Court Complex, (G003)
• Site Supervision works
• Preparing & submitting BOQ to PWD office.
• Arranging construction materials to subcontractors
• Scheduling the site activities daily basis.
Contact Info
Email: [email protected]
Mobile: (974) 74732695
Temp. Address: Musheireb, Doha, Qatar
Visa Status: NOC - Transferable
Core Skills
RC Structural Works
Project & Team Management
Engineering Documents
Planning & Cost control
Post tension Slab
Site Supervision
Rebar Engineering
Personnel Skills
Team Work
Leadership
Analytical
Problem Solving
Planning
Dedication
Work under Pressure
Soft Skills
Auto-cad
MS Office
Primavera
MS Project
Revit
Language Skills
Tamil
English
Hindi
Accomplishments
• Successfully Hand-over Shaza Hotel project & Redline South EAG project
• Strong knowledge in RC Structural works
• 120 tons of rebars fabricated in one day.
• Advanced knowledge in construction techniques & Engineering fields.
• President in University Civil Association.
• Analyzing construction drawings/documents
• Executed RC slanted Columns
Personnel Info
Date of Birth: 26.10.1991
Nationality: Indian
Marital Status: Single
Passport Number: L 9318267
Validity: 04/05/2024
RESUME
Education
2008-2012
Bachelor’s Degree in Civil Engineering (80%)
Anna University (BIT Campus), Tamilnadu, India
Project Name
Doha Metro (Redline & Gold line)
Shaza hotel – 5 Star hotel (3B+GF+MF+FL14+PH)
Worli Mixed Use Project (4B+GF+GF+FL82)
Location
Doha, Qatar
Doha, Qatar
Mumbai, India
Client
Qatar Rail Company
Abdulla Jaber Ali Bin Thani
Oasis Realty
Consultant
Louis Berger + Egis Rail JV
Faithful Gould & CEG
Leslie E. Robertson Associates
Contractor
FYAP JV
Domopan W.L. L
Samsung C & T
Sub-Contractor
BFG International
(Working here – Project Coordinator)
WEN Qatar W.L.L
(Worked here – Technical Engineer)
Eversendai Construction
(Worked here – Assistant Engineer)
Contract Value
$ 33 million
$ 8 million
$ 65 million
Period
Mar’2017- Mar’2018
Mar’2015 – Mar-2017
Nov’2012 – Jan’2015
Career Highlights:
Technical review of Drawings and check for conformance to the Contract, Specifications and required construction methodology.
Working closely with a team of other professionals such as building service engineers, construction managers, quantity surveyors and architectural technologists
Adapting plans according to circumstances and resolving any problems that may arise during construction;
Prepare, Monitor & Review submittals: materials, method statements, shop drawings, progress reports, execution plans, etc… Propose alternate solutions for ambiguous items without compromising the project change management protocols and quality
Attend all designated meetings in house, with the client or nominated representative, with sub-contractors, designers and on site
Develop and maintain the project schedule and distribute information in a timely manner to ensure that full compliance to the contract is adhered to.
Manage and monitor all sub-contractor's work for compliance to their contracts
Liaise with the planning department in regards to design, engineering, production, logistic and installation scheduling
Liaise with the commercial department and the Project Quantity Surveyor on all variations and cost implications
Liaise with the procurement and production departments on all technical procurement issue
Prepare, monitor and track all PCO's (Proposed Change Orders) and CO's (Change Orders)
Prepare Daily, weekly and monthly progress reports for submission to Senior Management and client
Coordinate the flow of information between sub-contractors
Ensure in coordination with Site Engineers that execution of works are to the required quality and safety and resolves all technical problems for all trades.
Anticipate standard solutions, also prepare & follow-up technical queries with the Client/Consultants
Attending ISO quality audits and confirming all required documents.
Arranging third party tests for the materials & mockups, concrete defects.
Coordinating with Post tension designers to convert slab design from RC to PT and getting approvals from third party consultants. Also get clearance from MEP division, Architects and other firms.
Preparation of technical proposals for tenders, tender invitations, comparison sheets & quotations.
Review contract documents & advise the Project Manager on technical matters affecting construction and time costs
Supporting tender team by providing reports for actual site productivity rates, construction difficulties, equipment requirements and quick analysis of tender project according to documents.
Procurement of materials as per site requirements – Rebar (BBS optimization), Form work materials (as per drawing qty), Concrete (exact qty & pump details) and arranging temporary site logistic requirements.
Preparation of look ahead schedules, site logistics plan, crane schedules, MOM, delay analysis, site diary, production reports, purchase orders.
Collaborate with quantity surveyors to prepare and submit the monthly internal payment requests.
Managing site rebar productions, rebar wastage, form work materials handling, concrete pumps, placing booms and other heavy equipment requirements.
Inspecting core wall climbing systems, scaffolding platforms and supervising post tension slab stressing & grouting.
In-charge to get approvals from consultants for pre-pour inspections of post tension slab, slip form work systems, loading platforms and temporary structures.
Declaration
I hereby declare that all the information stated above is true to the best of my knowledge.
Date :
Place : Doha, Qatar (VINOTH. M)
Information