Description
SUMMARY
Master’s Graduate in Mechanical Engineering with Approximate 2 years of experience in Design, Estimation, Supervision/Implementation of HVAC for Commercial, Residential Buildings in India .With expertise in HVAC for Office Buildings, Bank, Shopping mall and many others. Profound Knowledge of Plumbing & Fire Protection services in the residential & commercial buildings. Well versed with the preparation of drawings.
EXPERIENCE Well experienced in HVAC Design and Installation. Worked with Sub-contractor on many sites at Hi-Tech city which includes- Complete Designing of A/C space, cooling load calculations, CFM calculation, Air Distribution, Duct Designing, Calculation of no. of sheet & Gauge required, Selection of Diffusers, Duct Grills, Selection of AHU/FCU, Preparation of Duct Drawing, Execution of Ducting, Installation and Commissioning of Splits and Package A/C Units. Installation of FCU and Duct work, Installation of SAD/RAD, SAG/RAG works.
PROJECT WORK Designed project work of HVAC for Ground 0010 Typical Floors Residential Building during Training of HVAC Design > Design & Drawing of all types of Split A/C and Preparation of Duct layout with Supply and Return Diffusers, Duct Grill, Slot Diffusers with flexible connections for G0010 Typical Floors Residential Building.Cooling Load calculations by manual method with E-20 Form, CFM calculation & Air Distribution to various branches of duct. Duct Size Calculation by Duct Sizing Method/Equal Friction Method, Calculation of No. of G.I Sheet & Gauge required, Selection of SAD / RAD (2-Way, 3-Way,4-Way ), SAG/RAG, Slot Diffusers etc.
Selection of FCU with reference to TR required in particular Rooms/Halls.Static Pressure Calculation for Selection AHU.
GPM calculations and Distribution of Chilled Water to various FCU & AHU through chilled Water Supply & Return Pipe.
Calculation of Chilled Water Supply & Return Pipe Diameter & Pipe friction losses through Standard Friction Chart for Closed Piping Systems.
Selection of Chillers through Catalog of CARRIER &TRANE on the basis of TR capacity required for completed G0010 floors, and Leaving Chilled Water Temp & condenser Entering Air Temp. Also selection of physical & performance Data through Catalog, Also selection of stand by Chillers based on TR for future purpose.
> Pump Head Calculations for the selection of Chiller pumps by considering complete chilled water supply & return pipe length and all the fitting equivalent length (Bend, Tees, Reducer, DRV, NRV, Strainer, F.C, I.V etc ), also selection of stand by pumps.
> Preparation of Roof Floor Plans for the location of Chillers, Chiller Pumps, Pumps standard connections, chilled water supply & return header pipes, Dosing Tanks, Expansion Tank, Automatic Air Vent, the location of Exhaust fan and Fresh Air Handling Unit etc.
> Preparation of Riser Diagrams showing locations of all the equipments with details Preparation of FCU schedule, No. of LH/RH FCU required with TR, preparation of Bill of Quantity/Material (B.O.Q).
• Track record of designing and implementing both simple and complex HVAC systems to suit residential and commercial needs.
• E-20 Form, ASHRAE / SMACNA Standards, Window A/C, Spilt A/C.(Ductable/ Non-Ductable), Package, Plumbing/Fire Fighting, Tendering, Estimation & B.O.Q.
Information