- Worked as a Site Electrical Engineer (Low and Medium Voltage) in PRIDE Electrical Contractors from 5th. January 2015– 6th. January2017.
- Completed Projects are:
- Industrial constructions project, named SCHNEIDER ELECTRIC.
- Residential project TEJ SADAN Apartments.
- Charged 33KV from underground cables by laying in cable trench and in Hume pipes.
- Conducted the Megger test for verifying the electrical insulation level and Earth Resistance Test for soil resistivity.
- Monitored the installation and commissioning of
- 33KV HT VCB switchgear(1250A,26.24kA,TP,HDO type),
- 2MVA Transformers (33KV/415V ONAN with OLTC and RTCC panel)
- 415Volts PMCC(4000A,150kA,TPN,EDO type ACB with Micro-processor)
- 350KVAR APFCP (630A,1000kA,TPN,EDO type ACB with Micro-processor
- 100KVA UPS (250A,35kA,TPN MCCB)
- Sandwich type Outdoor bus duct(4000A,112kA,TPN with class-F insulation)
- Lighting DB and UPS DB (4way, 6way, 8way, 12way)
- Providing CI,GI,Cu earth station for all machinery equipments.
- All Internal Electrification works include
- Circuit wiring and control wiring based upon the phase distribution.
- Point wiring with switch and MCB control for primary and secondary light point, two way switch point etc.
- Street lighting works for entrance and exit roads for building.
- Switch socket outlets with independent and dependent type.
- Cable trays, conduits, raceways and cable routing. for power and networking.
- Hands on experience in designing, planning, estimation and execution of Electrical activities.
- Certificate course in ELECTRICAL DESIGNING & DRAFTING for residential and commercial building loads at NSDC affiliated Dhanush Engg. Services Pvt. Ltd.
- AUTOCAD and DIALUX.
- MS-Office (Excel, Word and PowerPoint).
Training:
- Two months training of Electrical Building Services Design
- Project: COMMERCIAL BUILDING (1B+G006Floor).
- Estimating Total connected load for a project (Electrical Load+HVAC Load+Plumbing load+Elevator+Escalator).
- Segregation of estimated maximum demand into individual load centers.
- Calculation of room index and Light fixtures required for area.
- Balancing the Load Schedule using MS-Excel.
- Selection of Transformer, DG Set and UPS ratings.
- Short circuit current and voltage drop calculations at each level of distribution.
- Selection of HT and LT switchgear based on full load current, fault current and tripping time.
- Selection of HT and LT cables based on current carrying capacity and derating factor.
- Design of Earthing and Lightning protection system, Selection of Capacitor bank and bus bar size.
- Preparing B.O.Q according to the designed layout and material required.
Preparation of detailed Single Line schematic and all necessary drawings using AutoCAD software