MAIDEEN ABDUL KHADAR JAILANI

MAIDEEN ABDUL KHADAR JAILANI

Member since: March 2015
Send a Message
Timeline
About

Dear Sir/Madam,
At the outset, let me introduce myself. I am MECHANICAL ENGINEER having experience in oil and gas field. Experienced in Installation and Erection of Internal Column, Pressure Vessel, Lube oil cooler in oil and gas plant in SAUDI ARAMCO PROJECT, Saudi Arabia. Knowledge in MEP Projects, HVAC, Planning, Monitoring, Preparation of BOQ and Estimation of Projects during which time I have worked in an MEP contractor in India. Experience in project Execution, mechanical engineering supervision, and Project management of Industrial, Commercial and Residential Buildings. Experience in intense construction and contract management. Expertise in execution of MEP functions in large projects like hotels, shopping malls, Corporate offices, High rise luxury apartments, hospitals, High rise complexes. I am sending this resume cover letter to apply for construction, quality, planning, production related job in your concern. I have enclosed my resume with this.
During my career, I have handled all assignments with a sense of responsibility and commitment to achieve all assigned targets and deliver positive results.The enclosed resume outlines my credentials and accomplishments in greater detail.
I am also young, energetic and committed to achieve the corporate goals. If you are interested in a self motivated and highly competent candidate, we should speak. I am always available for interview at your convenience.

RESUME
MAIDEEN ABDUL KHADAR JAILANI.T
B.E - Mechanical Engineering
Production,Quality,Planning,Construction

CAREER OBJECTIVE:
Aspiring for an intellectual career that places me in a challenging position within a fast-paced and learning-oriented environment so that my knowledge can be innovated for the successful execution of projects.
ACADEMIC QUALIFICATIONS:
B.E - Mechanical Engineering : 78.8%
(July 2009 to April 2013) SSM College of Engineering, Komarapalayam,
Affiliated to Anna University.
Higher Secondary Course : 80.08%
(March 2009) K.A.P Viswanatham Higher Secondary School,
Tiruchirappalli.
Secondary Course : 74.75%
(April 2007) A.K.K.V Aarunadu Matric. Higher Secondary School Tiruchirappalli
SOFTWARE SKILLS:
 Auto-Cadd
 Solid Edge V20
 Femap- NX nastran
 MS-Word, Excel & Power point
FIELD OF INTEREST:
 Field Inspection, Field Engineering
 Engineering Mechanics
 Engineering Graphics
 Fluid Mechanics
PROFESSION EXPERIENCE:
 Since Oct 2013 to Till date
1. Project : Assembly and Installation of Column Internal Trays in Wasit Gas Plant
Contractor : IK Holding Company
Client : Saudi Arabian Oil Company (SAUDI ARAMCO)
Position Held : Site Engineer
Activities
 Mechanical scope involves the assembly and Installation of Schoepentoeter, Chimney tray, Mist Distributor, Lattice beams, Hi-Fi trays, Tray Panels on its own column.
 Knowledge in Erection of Internal Column using the Crane as per requirement.
 Experienced in Internal Installation of equipment as per Work Method Statement, with safe handling of the materials.
 Attending site visit and full responsibilities depend upon me.

2. Project : Erection of Pressure Vessel and Fit-Up & Welding of Static Equipment.
Contractor : IK Holding Company
Client : Saudi Arabian Oil Company (SAUDI ARAMCO)
Position Held : Site Engineer
Activities
 All Activities Related to Mechanical scope involves the Erection, Installation, Fit-up , Welding and NDT Testing on Pressure Vessels.
 Knowledge in Erection of Pressure Vessel using the Crane as per requirement.
 Thermal oxidizer, Waste heat boiler, Reaction Furnace assembled and Welding with SMAW process as per WPS.
 Mechanical scope found the welding defect could be found using with respective materials handling.

3. Project : Erection of Lube Oil Cooler in Wasit Gas Plant (Saudi Aramco Project)
Contractor : IK Holding Company
Client : Saudi Arabian Oil Company (SAUDI ARAMCO)
Position Held : Site Engineer
Activities
 Mechanical scope involves the assembly and steel structure erection on its own foundation.
 Erection Of Lube Oil Cooler on its own site, and assembled the fan hoods and fan blades as per ASME Standards.
Construction Related Activities

 Study of Pressure Vessels drawings and P&ID, structural drawings, Production drawings and other components.
 Responsible for all arrangement for Erection of pressure vessels and Welding Related activities.
 Responsible for Onsite presence during construction.
 Responsible for arrangement of the different NDT as per Standard requirement and getting NDT clearance of Weld joints and Defects.
 Check activity as per drawing like visual inspection of weld defect, and also check bill of material with co-ordinate client people.
 Bolt Torquening and Bolt Tensioning.

Inspection Related Activities.

 Inspection of Pressure Vessels which include dimensional and quality checking
 Preparation of all types of Dimension list.
 Inspection of Vessels horizontal dimension with Theodolite and Auto-level instrument.
 Co-ordinate with QC supervisor and QC manager regarding Inspection.
 Carrying out positive material identification (PMI) on Weld joints.
 Inspection of Raw materials like Pipes, Flanges, Gaskets etc with reference to equipment drawings.
 In process inspection at the various stages of fabrication like layout inspection, fit¬-up inspection, welding inspection of Pressure vessel and Piping Joints.
 Conducting and Witnessing of Visual Testing of Fit-Up and Welding throughout construction.
 Conducting and Witnessing of Non Destructive Examinations like Penetrant testing (PT), Magnetic Particle Testing (MT), Ultrasonic Testing (UT), and Radiographic Testing (RT) of weld joints of Pressure Vessel and piping.
 Leak Testing of Pressure Vessel.
 Preparation and submission of daily Inspection reports and other relevant documents as needed.
 Team Member for handling customer complaint and solving the problem
 Co-ordinate with third party inspection agencies and customers.
 Deal with other department like Engineering, Planning, and Construction for material problems, line modification and clashing, supports and as built clarification.
 Involved in PWHT Activity after Welding.
 Hardness Testing of Weld joint after Post Weld Heat Treatment.
 Involved in Pneumatic and Hydro testing of Pressure Vessel after completing of all activities.

 Apr 2013 to Sep 2013
Contractor : SERVCO ENGINEERING SERVICES PVT.LTD, Chennai.
Position Held : Mechanical Engineer
Activities
 Expertise in execution of MEP functions in large projects like hotels, shopping malls, Corporate offices, Hospitals, Residential Building construction projects.
 Project reporting, Site co-ordination, Client meeting presentation and team supervision.
 Facility management, operation and maintenance, maintenance operation Policies and procedure.
 Prepare the detailed Site quantities requirement based on the consultants approved drawings.
 Preparation, execution& monitoring, Testing & commissioning of all MEP systems like HVAC, Plumbing,FM200, Air Sampling system, medical gas, complete electrical & low current systems as per compliance with the plan, shop drawing, specification, standards & schedule.
 Preparation of workshop drawing and submit to consultant for approval.
 Mobilization of manpower for execution of the project.
 Supervision of installation of HVAC, Plumbing & Firefighting items as per standard norms.
 Floating Request for Inspection of installations to Consultant and rectifying if any snag works / comments.
 Pricing of the complete job from the basic details, market and with latest plant, labor & material cost using MS Excel.
 Preparation of material submittal for consultant approval.

 Sep 2012 to February 2013
Contractor : Primetech Inspection Service, Erode.
Position Held : NDT SUPERVISOR in Magnetic Particle Testing (Part Time)
Activities
 Different types of Crack Could be found using with respective materials handling.
 Penetration test or Liquid Penetration testing, Magnetic Particle Testing, Radiographic testing, Ultrasonic testing.

TRAINING ATTENTED:

 Participated in 5 days talent spotting scheme coaching camp held at Anna stadium Trichy, conducted by sports development authority of Tamil Nadu
 Actively participated in various sport events, in-inter school level and bagged many prizes.
 Participated in 5 days training in Non Destructive Training class in Erode.
 I had done NDT Level II course (PT, MT, RT, UT).
 I has completed the course for usage of BW GAS ALERT MAX XT II.

PROJECT UNDERTAKEN:
 MINI PROJECT: Design and Fabrication of Chimney Control.
 MAIN PROJECT: Optimization of Welding Process Parameters of MS Plate Using SMAW Process

CO-CURRICULAR ACTIVITIES:
 I got Appreciation certificate of “Static Equipment Inside Installation, Welding and Testing” at Saudi Aramco Wasit Gas Project.
 I had Presented a paper titled of “Optimization of Welding Process Parameters of MS Plates Using SMAW Process” in national conference on Rtime 2012.
 Participated “Best Manager competition” in 2011 and 2012.
 I had attended the workshop entitled “New International Jobs And Emerging Technologies” on 22 Jan 2012.
 An ISTE member.

EXTRA CURRICULAR ACTIVITIES:
 Participated in tamilnadu junior kabaddi championship as one of the player of Namakkal district.
 I took major responsibilities to coordinate and do my best to organize the function.
 Stood 2nd prize in East zone throw ball championship and got recognized as a good team player.
 Won 1st prize in school level karate tournament.
 Class Representative in College Days.

INDUSTRIAL VISIT:
 Hydraulic power station, Mettur, Tamilnadu.
 Steel authority of India Ltd, Salem.
 Sakthi Auto component Limited in Pallakoundapalayam.

PERSONAL TRAITS:

 Quick learner and able to grasp new ideas, concepts and methods.
 Ability to work as an individual and in a group.
 Ability to think critically, evaluates situations, make decisions & Solve problems.

PERSONAL PROFILE:

Name : Maideen Abdul Khadar Jailani.T
Father’s Name : Thaika Pitchai.M
Date Of Birth : 13.04.1992
Nationality : Indian
Religion : Muslim
Languages Known : Tamil, English, Hindi
Marital Status : Single
Passport Details : K7807553
Driving License : India

DECLARATION:

I hereby declare that the above particulars are true to the best of my knowledge and I assure you that I will work in the right earnest and fulfill the expectations of my superiors.

Place : DOHA Yours Sincerely,
Date : (MAIDEEN ABDUL KHADAR JAILANI.T)

Timeline

MAIDEEN ABDUL KHADAR JAILANI hasn't posted anything yet.