Email: [email protected]
: +974-55046031
Name: DILEEP.KUMAR.K S
CURRENT ADDRESS
ZIKREETH, DUKHAN-QATAR
PERSONAL DETAILS
Date of Birth : 08/05/1982
Sex : Male
Nationality : Indian
Marital Status : Married
Father’s Name : Subrahmanian
Mother’s Name : Sulochana
PERMANENT ADDRESS
KUNNATHULLY HOUSE
CHOOLISSERY(POST),THRISSUR
KERALA, INDIA, PIN: 680547
Ph:+91-9747784908
Objective:
To work in a progressive and challenging environment, which provides ample opportunities for enhancing and using my creative, technical and professional skills towards the fulfillment of goal of the organization I am working for.
Summary:
I am a Mechanical Engineering Diploma Holder having 14 years of extensive experience in Oil & Gas, Petrochemical Projects and Shutdown works as a site engineer and supervisor. Currently I am worked with Galfar almisnad Qatar(EPC) in the project of Qatar petroleum.
Current Project
1. Epic for route survey, design, construction, installation & hook-up of oil flow lines, gas lift flow lines, PWI spur lines & Arab D gas wells lines and pre-work over preparations and reinstatement for KHUFF gas wells for the year 2013 – 2015
Owner : Qatar petroleum
Designation : SITE ENGINEER
Field of Proficiency:
Responsible for Piping erection and pipe support installation in accordance with schedule, Procedures, Specifications, Priorities and Availability of Construction Drawings
Ensure the Productivity and Quality is maintained by subordinates. Coordinate with other Disciplines in site.
Knowldege in sp3d drawing
Assist Design Department in solving Piping Modification and Technical Problems in the Field.
Provide technical answers to Engineering Queries raised up by the sub-contractor confirming design drawings and standard requirements.
Responsible for counter checking by Isometric/Piping plan for the spools erected in the correct location, orientation, alignment and plumpness.
Carrying out final P&ID check of installed piping systems in the module.
Preparation of “AS BUILT” drawings.
Preparation of field piping system test packages ,including system limit on P&ID and piping Isometrics
Well knowledged in hydrotesting process
Experience in MEP projects (Mainly in chiller unit and fire Water pipings)
Responsible for carrying out Mechanical Clearance, Conducting Hydro and Pneumatic tests, fulfilling commissioning and Pre-Commissioning requirements for the project.
Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of piping / mechanical.
Ensure that hydro test reinstatement is to be done as per procedure
Ensure that all punch list items are resolved; client handover is satisfactorily concluded and that there is no prolongation of project.
Good knowledge in reconciliation of materials
Education Qualification:
Diploma In Mechanical Engineering:(State Board of Technical Education Kerala)
SP3D Design of piping:(Kagira institute Chennai)
Bachelor of Engineering ( Distance From ISMS Chennai)
Experience in Details:
1) Galfar Engineering & Contracting WLL,UAE-(Transfer from Galfar oman to galfar abudhabi due to project completion) From7th December 2011 to june 2013 as a Site Engineer piping for ADCO ,ASAB FFD project under Petrofac International Limited.(Construction of 6 no’s Remote De gassing Stations and well hook up line modification work).(Hydrotesting of pielines inside Takreer Ruwais project)
Duties & Responsibilities:
Responsible for piping fabrication and erection pipelines in pipe racks.
Responsible for carrying out Mechanical Clearance, Conducting Hydro and Pneumatic tests, fulfilling commissioning and Pre-Commissioning requirements for the project.
Ensure that hydro test reinstatement is to be done as per procedure
Punch list clearance.
2) Galfar Engineering & Contracting SAOG, Oman- From17September 2009 to november 2010 worked as a Site engineer piping in PDO ,Harweel Cluster Facilities 2A/B Project under Petrofac International Limited(Transfer to abudahabi due to project completion)
Duties & Responsibilities:
Responsible for Supervision of construction activities at field Fabrication and Erection of Piping Spools in Tank farm, Process Rack and Gas Sweetening areas.
Mobilization of Manpower, and planning daily weekly activities Interaction with Contractor & client.
Mobilization & locating of Welding Machines, Cranes and other equipments, as per daily scheduled for installation, Erection of Piping & Equipment activities.
Conducting Daily tool box meeting according to the Safety procedures and standards.
Coordinate with QA/QC team for clearing NDT activities as per Piping Class & Project Requirement.
Responsible for Handling & Storage of piping materials like SS, CS, LTCS, GI,
Rerouting the line according to the Site Query and Field Change note.
Preparing As-built mark up drawings, Weld mapping for Field joints and final review of Test packs.
Performing Line walk down of Test packs and Preparing of Internal punch list to clearing the punch points as per Category A, B & C.
Coordinate with Hydro test team for preparation of Hydro test, Pneumatic test and Flushing, Blowing Activities.
Coordinate during Re-instatement Activities to closing the punch points.
Coordinate Flange Management Activities as per Project Requirement.
Coordinate during pre-commissioning activities with Commissioning Team.
3) Consolidated contractors international company SAOG (CCIC)- From 25/04/2007 to July 2009 worked as a Engineer construction in Qatar gas plant. Expansion project Train 6.at Ras laffan.(Project completed)
Duties & Responsibilities:
Responsible for Supervision of construction activities at the Field
Fabricated spools identification and erection
Supervision of all erection activities
Work with test packages for the completion of piping loops.
Experience In India
Reliance Industries Ltd, Hazira Gujarat, India, (CTA drier project) worked with Excellent projects india pvt ltd, Gujarat, India-From 22/12/2002 to 31/08/2006 as a Site Engineer.
Duties & Responsibilities:
Responsible for fabrication of spools in fabrication shop
Responsible for submitting daily progress reports
Spools fabrication according to priority
Conducting daily tool box meeting
Responsible for achieving target according to scheduled plan
Coordinate with QA/QC team for NDT activities
Shutdown Experience
RIL Patalaganga(With Excellent Projects India Pvt Ltd) -.in PTA drier project,CTA drier project,Maintenance of PTA (Pure Terepthatic acid) plant.
Additional Information
To read isometric drawings with MTO & Supports and work accordingly.
Familiar with International Design code like ASME, ANSI, API.
Experienced in construction activities of CS,SS,DS, and GI pipes.
Proficient in study piping and equipment layouts development and plot plan development
Familiar with software packages like windows, MS Word, EXCEL.
Knowledge of piping design with sp3d(smart pant 3d)
Details of Trainings and Courses Attended
Introduction to Health Safety and Environment
HSE for Supervisory Staff
Hazards and Effects Management Procedure (HEMP)
Job Hazard Analysis
Gas Testing
Work Permit Applicant Course
H2S Awareness and Escape
Interpersonal skills, leadership skills etc.
Passport Details:-
Passport No : F 6876313
Date of issue : 15.03.2006
Place of Issue : Cochin
Date of Expiry : 14.03.2016
Declaration
I hereby declare that the above statements are true and correct to the best of my knowledge and belief.
Subscribe to our newsletter to get the latest updates