JOB CATEGORY
EMPLOYMENT TYPE
Full-time
JOB LEVEL
YEARS OF EXPERIENCE
5-6 Years
LANGUAGE
English
Description
Key Deliverables:
- Collecting the document of staff, workers, sub-contractors for arranging gate passes for enter and exit according to site requirement.
- Coordinate with Authorities to preparing entry / exit gate pass, Once received the gate pass then updates the same to the PRO and related departments
- Coordinating and follow up to authorities related to site incidents/accidents.
- Co-ordinate with production, maintenance supervisors for planned and unplanned work,
- Coordination between Main office and site for the activities of employee allocation for the project, and provides detailed reports to the same.
- Handling Petty cash for the site requirement and provide reports to the Accounts department.
- Time keeping of all employees in the site and site transports, Coordinate with transportation & Logistics department for arranging transportation.
- Controlling & placement of various assets, Inventories, Equipment, and spares required for Projects
- Movement and Control of materials, and checked the same by physically, and updates into the system.
- Handling and safe keeping of all documents in a systematic way
- Initiating & conducted the Safety training under ADNOC, and Coordinating and setting up meeting.
- Coordinate with Vendors/Suppliers for the delivery of Items procured.
- Aware of Materials required for the Water Pipeline project by checking& verifying with the drawings.
- Combined & Familiar with Construction of Water Tank by using Slip Foam Method.
- Taking care of any other task or office requirement assigned by facility manager
- Review safety standards in the site and accepting work-permits depending on the nature of job.
- Attending the daily and weekly progress review meeting with client, consultant engineers and subcontractor, update them with the current site status and reports.
- Preparation of As Built reports and final Documentation.
- Monitor and ensure the correction of non-conformance report items and other issues supporting QA/QC compliance.
- Discussion with Designer if there any abstraction with piping.
- System Checking along with Piping & Instrument Drawings.
- Ensuring that all welders are qualified, and supervising the Welding activities are done as per the approved WPS.
Information